Master Bathroom Remodel in Pacific, MO
Some homes just make you slow down and breathe a little deeper.
Tucked into the woods this master bathroom remodel in Pacific, Missouri, had the kind of charm that instantly makes you imagine a different pace of life. You know the type. Towering trees. Quiet mornings. Bird feeders everywhere. Maybe even a pool tucked behind the house. Honestly, it felt like the kind of place where you could disappear from the chaos of everyday life and never want to leave.
So naturally, when it came time to remodel the master bathroom, the goal wasn’t simply to update finishes. Instead, we wanted the new space to feel like it truly belonged with the rest of the home. Warm. Relaxing. Comfortable. Timeless. Functional.
At the same time, this project marked the beginning of a brand-new chapter for the homeowners themselves. Two lives were coming together, and like many couples starting fresh, they decided to jump straight into a remodeling project together. Talk about a crash course in teamwork.
Fortunately, they were incredible to work with, and together we transformed an outdated early-1990s bathroom into a warm luxury retreat that feels dramatically larger, brighter, and more functional than the original space ever could.
If you’re considering a master bathroom remodel in St. Louis or exploring ideas for your own space, this project offers a great example of how thoughtful design can completely transform the way a bathroom looks and functions.

The Original Master Bathroom in Pacific, MO: Dark, Dated, and Cramped
Like many homes built in the early 1990s, the original bathroom prioritized a large soaking tub over a functional shower. While that layout may have been trendy decades ago, it no longer matched the homeowners’ lifestyle or the overall scale of the home.
The existing shower was especially tight. Measuring only about four feet wide and roughly six feet tall, it felt cramped and closed in. Additionally, there was no recessed storage for shampoo or soap, and the aging shower door barely opened and closed properly anymore.
Meanwhile, the flooring and shower walls featured dated tile with oversized grout joints that had definitely seen better days. The 12” x 12” floor tile instantly dated the room, while the aging grout lines made the space feel even older.
The layout also created unnecessary visual barriers throughout the room.
The toilet sat inside a separate enclosed commode room, which may sound luxurious at first. However, the framed walls actually made the overall bathroom feel significantly smaller. Worse yet, the toilet compartment itself felt tight and cramped.
Lighting presented another major issue.
A single vanity light fixture centered over both sinks provided most of the illumination in the room. Beyond that, there was only one recessed can light over the tub and a basic ceiling-mounted fixture above the toilet area. The result? Shadows everywhere and a space that constantly felt dim and closed in.
Storage also fell short.
Although the vanity included two sinks, the cabinet layout wasted valuable space. Both sinks were squeezed onto a single wall with only one shared drawer stack between them. The recessed medicine cabinets on the side walls added very little practical storage and contributed to the dated appearance.
Simply put, the bathroom no longer matched the beauty and character of the home surrounding it.
Existing Bathroom in Pacific, MO Before Remodel
Ready to get Started on Your Remodeling Project?
The Goals for the Remodel
Right from the beginning, we all agreed on several key priorities.
First, the room needed to feel more open.
Second, the shower absolutely needed to grow.
Third, the tub had to go.
By removing the enclosed commode room and eliminating the oversized bathtub, we could dramatically improve both functionality and visual openness throughout the space.
Additionally, the homeowners wanted the finished bathroom to feel warm and inviting rather than cold or overly modern. They loved transitional styling with a soft luxury feel, so we focused heavily on warm wood tones, marble-inspired surfaces, matte black accents, and layered lighting.
Most importantly, they wanted a bathroom that actually worked for daily life.
That’s where our proprietary 4P Remodeling Process became incredibly valuable.
Starting with the 4P Remodeling Process
Every Thompson Price remodeling project begins the same way: with a thorough site survey and planning process.
Before any design work starts, we visit the home to carefully measure the space and inspect the surrounding areas. During this stage, we evaluate plumbing, electrical, HVAC, structural conditions, and potential obstacles before demolition ever begins.
This upfront planning helps eliminate surprises later in the project.
After gathering measurements and site information, our design team returned to the showroom to begin creating two completely unique bathroom designs for the homeowners to review.
Design Option One: Bigger Shower + Better Storage
The first design relocated the shower into the original tub location.
This immediately created a much larger shower while also opening opportunities for better vanity storage throughout the room.
Where the original shower once stood, we designed a smaller secondary vanity area. Meanwhile, the primary vanity location became home to a larger single-sink vanity paired with a tall linen cabinet for dramatically improved storage.
The result felt balanced, open, and highly functional.
Design Option Two: Dramatic Vanity Wall
The second concept took a completely different approach.
Instead of prioritizing the shower, this design focused on creating an oversized vanity wall stretching nearly the full length of the room.
To complement the longer vanity, we incorporated a dramatic transom-style window above the cabinetry, helping flood the room with natural light. Opposite the vanity, we designed an exceptionally large walk-in shower where the original vanity once stood.
Visually, this option looked stunning.
However, after reviewing both concepts together, the homeowners preferred the overall functionality of the first layout—with a few custom modifications, of course.
Plumbing Wizardry and Custom Design Solutions
Selecting the first layout required significant plumbing relocation behind the scenes.
Because the shower moved into the original tub location, several drain and water supply lines had to be relocated. Additionally, we already knew the existing window would need replacement since it would now become part of the actual shower enclosure.
To ensure safety and durability, we specified a tempered replacement window specifically designed for wet-area installation.
We also built a custom half wall between the shower and vanity area. However, instead of making it standard thickness, we intentionally designed it deeper so it could house recessed shampoo and soap storage inside the shower.
This small design decision added major functionality without cluttering the clean lines of the new space.
Warm Luxury Materials and Finishes
From the beginning, we knew tile would become one of the defining features of this bathroom remodel.
The homeowners selected large-format porcelain tile with a soft marble-inspired appearance that delivered all the elegance of natural stone without the maintenance concerns.
The tile extended floor-to-ceiling throughout the shower and eventually expanded beyond the original scope of work. In fact, once the installation started, the homeowners loved the look so much that they decided to continue the tile around the doorway and entry walls as well.
Meanwhile, the shower floor centered around a solid Onyx shower base.
Not only does an Onyx base provide a sleek appearance, but it also dramatically reduces long-term leak concerns compared to traditional tiled shower pans. You can also choose Onyx shower wall panels for a totally seamless look if tile isn’t your thing.
For the plumbing fixtures, we selected a clean transitional-style shower system in matte black finish.
The system included:
- A pressure-balancing valve
- A diverter valve
- A rain shower head
- A handheld shower mounted on a slide bar
Together, these elements created a spa-like experience while maintaining a clean, timeless appearance.
To complete the shower enclosure, we installed custom heavy glass panels with a return panel instead of a traditional framed swinging shower door.
This decision helped the room feel dramatically more open while also maintaining better visual flow throughout the space.
Smart Master Bathroom Remodel in Pacific, MO Storage Solutions
Storage played a huge role in the final design.
To maximize functionality, both vanity areas received custom recessed mirrored medicine cabinets with aluminum construction.
These cabinets featured:
- Mirrored interiors and exteriors
- Adjustable glass shelving
- Deep storage capacity
- Optional integrated electrical outlets
- Optional integrated lighting
Unlike older recessed medicine cabinets, these units feel premium, modern, and highly functional.
For the vanity cabinetry itself, the homeowners selected beautiful Waypoint Cabinets in the 580F door style with Cherry Clove finish.
The rich wood tones instantly warmed the room and paired beautifully with the soft veining in the countertops.
Speaking of kitchen countertops, the homeowners selected MSI Calacatta Miraggio Gold quartz.
This surface delivered the elegant look of marble while offering easy maintenance and durability for everyday life. The soft warm veining tied the entire room together beautifully without overwhelming the space.
The Construction Timeline
Demolition for this bathroom remodel began on August 4 and the project wrapped up on October 27.
While some companies advertise lightning-fast remodeling timelines, we’ve learned that quality craftsmanship simply takes time.
Demolition alone took roughly one week because of the amount of tile removal and wall framing involved.
After demo, we reframed portions of the bathroom and created the recessed medicine cabinet openings along with the new shower half wall.
Once framing finished, the plumbing, electrical, and HVAC professionals began rough-in work. Due to the extensive plumbing relocation required for the new layout, mechanical work took approximately four additional days.
After inspections were completed, drywall installation began.
Hanging, taping, and sanding drywall throughout the bathroom took approximately one week before tile work could officially begin.
The Reality of Remodeling: Unexpected Challenges
Every remodeling project encounters surprises. This bathroom was no exception.
One of the most significant issues involved a failure within one of the shower valve joints.
Initially, everything passed pressure testing successfully after rough-in installation. However, over the weekend, a slow leak developed and eventually caused damage to the room beneath the bathroom.
Although frustrating, this situation highlights exactly why thorough testing and quality control matter so much during remodeling projects.
We replaced the valve assembly entirely and repaired the affected drywall below before moving forward.
Later in the project, we also discovered a cracked cabinet face frame during installation. The crack was extremely subtle and difficult to notice during initial inspection, but it became apparent once the cabinets were secured together.
Rather than compromise the finished project, we temporarily installed the cabinet for countertop templating purposes before replacing it entirely with a new cabinet.
Sometimes remodeling throws curveballs.
The important part is how those issues get handled.
Why Tile Installation Takes Longer Than Most People Expect
Tile installation for this bathroom remodel in Pacific, MO took roughly two weeks.
Many homeowners underestimate the preparation work required for a properly installed tile floor and shower system.
For floor tile, the backerboard must first be installed correctly in thinset mortar. Then, all seams and joints require taping and preparation before tile installation can even begin.
Similarly, shower installations involve multiple waterproofing steps before tile is installed.
In this bathroom, the quartz wall cap atop the half wall created another sequencing challenge. We tiled as much as possible initially, then returned later to complete the remaining tile installation after the quartz cap was installed.
These extra steps take time.
However, they also help create a bathroom designed to last for years rather than simply looking good temporarily.
Cabinetry, Countertops, and Final Finishes
Once the tile floor installation finished, vanity cabinet installation began.
Setting and trimming the cabinetry took approximately three days. Afterward, we measured for the quartz countertops, which typically require a 7–14 business day lead time before fabrication and installation.
Once the quartz countertops arrived, the finish trades returned to complete:
- Plumbing fixture installation
- Sink hookups
- Electrical trim-out
- Lighting installation
- Final shower tile completion
At that point, the shower glass could finally be measured.
Because custom glass must fit perfectly to finished surfaces, measurement cannot occur until nearly everything else is complete. Glass fabrication then required another 7–10 business days before installation.
Finally, after the homeowners completed painting themselves, we returned to complete trim work, punch-list items, and final detailing.
The Final Result
Today, this once-dark and cramped 1990s bathroom feels completely transformed.
The room now feels dramatically larger, brighter, warmer, and more functional. The oversized shower creates a true spa-like experience, while the warm cabinetry and marble-look porcelain tile help the space feel timeless rather than trendy.
Most importantly, the remodeled bathroom finally complements the beauty and character of the wooded Pacific, Missouri home surrounding it.
Projects like this are exactly why we love what we do.
At Thompson Price Kitchens, Baths & Home, we believe remodeling should feel exciting—not overwhelming. Through careful planning, transparent communication, and thoughtful design, we help homeowners create spaces that truly improve everyday life.
If you’re considering a master bathroom remodel in Pacific, MO or anywhere throughout the St. Louis area, we’d love to help you explore the possibilities.
You can also browse more:
Master Bathroom Remodel in Pacific, MO FAQ
How long did this master bathroom remodel take?
This master bathroom remodel began with demolition on August 4 and reached completion on October 27. While every project is different, most master bathroom remodels take between 6 and 10 weeks depending on the scope of work, material selections, permitting requirements, and custom product lead times.
Can you remove a bathtub and replace it with a larger shower?
Absolutely. In this project, we removed an oversized bathtub and relocated the shower into the former tub location. This allowed us to create a much larger walk-in shower with improved storage, custom glass panels, a rain shower head, and a handheld shower system.
Why did you remove the enclosed toilet room?
The original toilet room made the bathroom feel smaller and more closed off. By removing those walls, we opened up the floor plan, improved sight lines, increased natural light throughout the room, and created a more spacious overall feel.
What type of tile was used in this bathroom?
The homeowners selected large-format porcelain tile with a marble-inspired appearance. Porcelain tile offers the elegant look of natural stone while requiring less maintenance and providing excellent durability for bathrooms and showers.
Why choose porcelain tile instead of natural marble?
Many homeowners love the appearance of marble but prefer the lower maintenance of porcelain tile. Porcelain is highly durable, resists staining, and does not require the same sealing and maintenance that natural marble often needs.
What is an Onyx shower base?
An Onyx shower base is a solid-surface shower pan manufactured from a durable composite material. It provides a clean appearance, is easy to maintain, and eliminates many of the leak concerns associated with traditional tiled shower floors.
What cabinets were used in this bathroom remodel?
This project features Waypoint 580F vanity cabinets in Cherry Clove finish. The warm wood tones complement the marble-look tile and quartz countertops while providing durable storage for everyday use.
What countertop material was selected?
The homeowners chose MSI Calacatta Miraggio Gold quartz countertops. This quartz surface offers the appearance of natural marble with excellent durability, low maintenance requirements, and a timeless design aesthetic.
Why were recessed mirrored medicine cabinets installed?
The recessed mirrored cabinets provide significantly more storage than traditional wall mirrors while maintaining a clean and uncluttered appearance. These cabinets feature adjustable glass shelves and help maximize storage without taking up additional floor space.
How large was the new shower?
The new shower is substantially larger than the original four-foot-wide shower and includes a custom half wall, recessed storage niche, floor-to-ceiling porcelain tile, matte black fixtures, and custom heavy glass panels.
Do custom shower glass panels take longer to install?
Yes. Custom shower glass must be measured after the tile, countertops, wall caps, and other finished surfaces are complete. Fabrication typically takes 7–10 business days after final measurements are taken.
What happens if unexpected issues are discovered during remodeling?
Occasionally, remodeling projects uncover unexpected challenges. In this project, a plumbing fitting developed a leak after rough-in testing and a cabinet arrived with a cracked face frame. Our team addressed both issues immediately and completed the necessary repairs and replacements before moving forward.
Why does tile installation take so long?
Proper tile installation requires several preparation steps before any tile is installed. Backer board must be installed correctly, seams must be reinforced, waterproofing must be completed, and layouts must be carefully planned. While these steps take additional time, they help ensure a beautiful and long-lasting result.
How much does a master bathroom remodel cost in Pacific, MO?
The cost of a master bathroom remodel depends on the size of the space, layout changes, material selections, plumbing modifications, and custom features. Projects that include custom showers, tile work, quartz countertops, and premium cabinetry generally require a larger investment than cosmetic updates. During our design process, we provide detailed pricing so homeowners understand exactly what is included.
Do I need a permit for a master bathroom remodel in Pacific, MO?
In many cases, yes. Bathroom remodels that involve moving plumbing, electrical work, structural changes, or modifications to walls typically require permits and inspections. As part of our remodeling process, we help homeowners navigate permitting requirements when necessary.
Can Thompson Price help with bathroom remodeling outside of Pacific?
Yes. We complete bathroom remodeling projects throughout the St. Louis metropolitan area, including Chesterfield, Ballwin, Wildwood, Kirkwood, Fenton, Eureka, O'Fallon, St. Charles, and many surrounding communities.